Northern Ring Road – Missing Link
Warsak Road to Nasir Bagh Road | Infrastructure Project
Project Overview
SSZ Constructions is engaged as a Party Contractor on the Northern Ring Road – Missing Link project, a major urban infrastructure initiative to complete the northern segment of the ring road in Peshawar. The project will connect key arterial routes between Warsak Road and Nasir Bagh Road, reduce congestion, and improve regional traffic circulation. Under Package-I, SSZ Constructions focuses on high-performance drainage systems and engineered retaining walls to ensure long-term stability and resilience of the roadway. These works are critical for stormwater management, slope stabilization, and the long-term durability of the corridor.
Information
- Client: Peshawar Development Authority (PDA)
- Location: Peshawar, Khyber Pakhtunkhwa / Pakistan
- Type: Government Infrastructure
- Funded by : Government of Khyber Pakhtunkhwa
- Commencement : December 26, 2025
- Completion : In Progress
Image Gallery
Scope of Work
-
Drainage System Construction
Design and installation of surface and subsurface stormwater networks, culverts, and channels to ensure efficient runoff and prevent waterlogging.
-
Retaining Wall Construction
Engineered reinforced retaining walls and slope stabilization structures to resist soil pressure and control erosion along the roadway embankments.
-
Integration & Safety Works
Coordinated integration of drainage with pavement and structural systems, including erosion control measures and long-term maintenance provisions.
Testimonial
“SSZ Constructions delivered robust drainage and retaining solutions that significantly strengthened the Ring Road corridor — on schedule and to specification.”
— Project Representative